Knowledge exchange

Knowledge exchange

The use of FEM analyses as a support tool for optimizing ship design process, and thus the construction and ultimate operation

The key feature of the ships built today is the safety of their construction. In addition to protecting human life, the capability of operating in difficult conditions at sea and protecting natural environment is crucial. Furthermore, minimizing the risk of accidents and the costs of potential repairs, and thus high compensation payments, is also one of the key objectives of the shipbuilding process. The whole project must also be cost-effective and comply with agreed implementation schedules. The answer to these challenges is to optimize ship design in terms of quantity and weight of construction materials used. To this end, design offices use dedicated, specialized software to increase both precision and efficiency of strength calculations, as well as to comply with customer requirements and classification regulations and ensure the safety of the structure, while taking into account also the final cost of building the vessel.

Knowledge exchange

Ship design – challenges in contracting process (part II)

Diversified practices in the area of contracting ship design services affect the efficiency of project implementation, as discussed in the first part of the article. As we’ve recommended, the most beneficial solution is to divide contracting into two parts – first tender including concept and contract design, and second procedure covering basic design and workshop documentation of the ship. Following article will introduce the complexity of the design process and benefits of implementing abovementioned division of contracting for all interested parties, i.e. the buyer, the design office and the shipyard.

Knowledge exchange

Ship design – challenges in contracting process (part I)

Ship design is a complex process, requiring meticulous planning, risk management and the ability to make compromises between the buyer/owner, the design office and the shipyard/builder. Design services contracting process is based mostly on tendering procedures, but the practices vary both in terms of the nature of the owner (public or commercial) and the location (domestic projects or foreign tenders). The following article treats the differences in contracting ship design, affecting further stages of the project, based on our 20 years of experience in providing services for ship owners in different parts of the globe.

Send us Your resume

SE-618 Shallow Draught LNG Feeder

SE-618

H10 Navy Tug

H10

SE-413 Patrol Boat

SE-413

SE-410 Patrol Boat

SE-410

SE-408 Offshore Patrol Vessel

SE-408

SE-407 Fast Patrol Vessel

SE-407

SE-406 Offshore Patrol Vessel

SE-406

SE-907 8 - 14 MWe Floating Power Unit

SE-907

SE-621 PCU Ro-Ro Car Carrier

SE-621

SE-615 Multifuel Bunkering Platform

SE-615

Message to Mariusz Czajkowski

Mariusz Czajkowski

SE-608 LNG Bunkering Vessel

SE-608

SE-607 LNG Floating Storage and Bunkering Unit

SE-607

SE-602 LNG Bunkering Vessel

SE-602

SE-601 LNG Bunkering Vessel

SE-601

SE-224 Crew Transfer Vessel

SE-224

SE-223 Crew Transfer Vessel

SE-223

SE-219 Crew Transfer Vessel

SE-219

SE-202 Wind Farm Service Vessel

SE-202

"USTAW TYTUŁ"

Message to Adam Ślipy

Adam Ślipy

Message to Agata Maderska

Agata Maderska

SE-308 Inland Passenger Vessel

SE-308

SE-208 SAR Multipurpose Vessel

SE-208

SE-305 Waterbus

SE-305

SE-304 Double - Ended Ferry

SE-304

SE-301 Shallow Water Passenger Vessel

SE-301

SE-806 Research Vessel

SE-806

SE-804 Research Vessel

SE-804

SE-217 Oil Recovery Vessel

SE-217

SE-211 SAR Multipurpose Vessel

SE-211

SE-209 Water Injection Dredger

SE-209

SE-111 SAR Multipurpose Rescue Vessel

SE-111

Message to Joanna Kandler – Łopacińska

Joanna Kandler – Łopacińska

SE-107 Multipurpose Vessel

SE-107

B870 Research Vessel (Oceanograf)

B870

SE-517 Freezing Trawler (Dunga Jákup)

SE-517

SE-514 5800 m3 Life Fish Carrier

SE-514

SE-807 Workboat

SE-807

SE-230 Landing Craft

SE-230

SE-216 Service Boat

SE-216

SE-114 Buoy Laying Vessel

SE-114

SE-110 Multipurpose Boat

SE-110

SE-108 Service Operation Vessel

SE-108